The Market at Green Top

A market. A fueling site. One complete project.

A market. A fueling site. One complete project.

NV designed the site and floor plan, consulted with engineers, and constructed the market building and fueling system.

PROJECT AT A GLANCE

7,000

SQUARE FEET

Market building.

Market building.

16

FUELING POSITIONS

Part of the overall site plan.

Part of the overall site plan.

3

TANKS

Included in the fueling-system scope.

Included in the fueling-system scope.

NV

DESIGN & CONSTRUCTION

Site, floor plan, building and fueling system.

Site, floor plan, building and fueling system.

01 / THE OVERALL PLAN

Designed around how the site works.

The Market at Green Top brings a 7,000-square-foot market and a fueling operation together on one site. The project included 16 fueling positions and 3 tanks, making the relationship between the building and the surrounding site central to the design.

NV designed the ergonomic site and floor plan, consulted with engineers, and constructed both the building and the fueling system. That involvement carried the overall plan from the drawing stage into the work on site.

02 / DESIGN TO CONSTRUCTION

From the first drawing to the work on site.

The original design study and construction photographs follow the project above ground, below ground, and inside the market.

Start with the whole site.

The market and the fueling area were planned as one project. NV designed the ergonomic site and floor plan and consulted with engineers, bringing the building layout and the surrounding fueling operation into the same planning process. The original facade study gives that work a visible starting point.

SITE DESIGN / FLOOR PLAN / ENGINEER CONSULTATION

Original design rendering of The Market at Green Top facade

Original facade design study for The Market at Green Top.

Exterior cladding and entrance construction at The Market at Green Top

The exterior taking shape during cladding and entrance construction.

Build above and below ground.

The scope extended beyond the market walls. NV constructed the fueling system as well as the building, with 16 fueling positions and 3 tanks. The field photographs show the underground installation and the concrete work that brought the forecourt together.

BUILDING / FUELING SYSTEM / FORECOURT

Crews placing concrete across the Green Top fueling forecourt at dusk

Concrete placement across the fueling forecourt at dusk.

Underground tank installation in an excavated area at The Market at Green Top

An underground tank during installation, before backfill.

Bring the floor plan into focus.

Inside the 7,000-square-foot building, the layout became a sequence of counters, service areas and open floor space. Wood finishes, dark exposed services and a green focal point give the market its character. The photographs follow the casework from fabrication in the shop to its place in the interior buildout.

INTERIOR LAYOUT / CASEWORK / FINISHES

Green Top interior buildout with wood accents, green beverage niche and casework

The market interior during buildout, with casework and finish materials in place.

Green Top casework being fabricated in the workshop

Casework being assembled in the shop before installation.

CONSTRUCTION SCOPE

The building and the fueling system, together.

Site & floor-plan design

Site & floor-plan design

NV designed the ergonomic site and floor plan and consulted with engineers as the project developed.

NV designed the ergonomic site and floor plan and consulted with engineers as the project developed.

Building construction

Building construction

Construction of the 7,000-square-foot market building and its interior spaces.

Construction of the 7,000-square-foot market building and its interior spaces.

Fueling-system construction

Fueling-system construction

Construction of the fueling system, including 16 fueling positions and 3 tanks.

Construction of the fueling system, including 16 fueling positions and 3 tanks.

THE DETAILS COMING TOGETHER

Beverage-area casework and green wall feature during interior construction

Beverage-area casework and the green feature during interior construction.

Fuel dispensers arriving on a trailer at The Market at Green Top

Fuel dispensers arriving at the site for installation.

Green Top fueling canopy and dispensers during installation

Canopy and dispensers taking shape alongside the market building.

PROJECT OUTCOMES

One site, brought together.

The delivered project combines the 7,000-square-foot market with 16 fueling positions and 3 tanks. NV’s role connected site and floor-plan design, consultation with engineers, and construction of the building and fueling system.